Pulling the O-300

I’ve finally decided to upgrade the old O-300D in 737 to an IO-360. I’m having Pinnacle Aircraft Engine do an IRAN inspection and should have the rebuilt engine in about 15 weeks.

Previous
Previous

Look Ma, No Panel!